Not the whole order. We can inspect a clearly defined, finished portion, but its results cannot cover goods that have not yet been produced. For our Final Random Inspection, the agreed inspection lot must be 100% produced and at least 80% packed. If the whole order is not ready, postpone the final inspection or agree separate lots and inspection scopes with our team.Final random inspection
Production completion and packing completion are different. An order that is fully produced but only partly packed is not the same as an order still being manufactured. The packing threshold does not mean every carton has been checked; the report must state the packing status and any checks that could not be completed.
The Lot Being Inspected
The purchase order sets the ordered quantity. The inspection lot identifies the goods presented for a particular inspection. Those quantities may differ. A sampling result relates to the stated lot, not to goods added afterward: ISO 2859-1 describes AQL-indexed sampling schemes for lot-by-lot inspection.2859 1
For a hypothetical order of 10,000 units with 7,000 finished, the remaining 3,000 are outside the finished goods available for inspection. The 7,000 do not automatically qualify as a final-inspection lot: their packing status, SKU coverage, accessibility, and agreed scope still need to be established. A result for that portion is not a result for all 10,000 units.
Define a separate lot before sampling, using SKU quantities and identifying carton ranges or production records where available. Do not add later production to that lot after the sample has been drawn. Passing a sample-based inspection does not establish that every unit is free of defects.
The Right Inspection Stage
| Order status | Inspection approach | Coverage limit |
|---|---|---|
| Production is still underway | Consider a during-production check; our usual window is about 30% to 50% finished and packed. | Available output at that stage, not the future balance. |
| A separate finished portion is ready | Agree a distinct lot and scope before the visit; apply final-readiness requirements to that lot. | That lot only, with its own findings. |
| The entire order is ready | Arrange a final inspection when production is complete and at least 80% is packed. | The defined order lot, subject to sampling and documented limitations. |
Our During Production Inspection checks available output while production continues. It is not a substitute for the later final inspection of the completed shipment lot.During product inspection
If a split shipment is planned, identify which SKUs and quantities belong to each shipment before agreeing inspection coverage. Each later lot needs its own assessment; an earlier result cannot simply be reused. If every unit of a defined lot needs checking rather than sampling, our full inspection examines units individually within the agreed checks. It still cannot examine goods not yet made.Full inspection
Our Inspection Preparation
At UTS, we finalize inspection criteria using the approval sample, product specifications, defect definitions, and agreed acceptance levels. Our published workflow then moves from the agreed checklist to random sample selection and physical checks. This preparation establishes what the visit will examine; it is not proof that the factory has already completed the order.During product inspection
Our checks use the purchase order, specifications, approved sample, drawings, and packing files supplied for the order. For orders with several models, colors, or sizes, the report identifies the SKUs sampled and the quantities checked.Www.utsinspection.com
Before confirming the inspection scope, provide:
- Ordered, finished, and packed quantities by SKU, plus the expected completion date for the balance.
- The proposed inspection lot and any split-shipment details, including which goods are at another location.
- Current specifications, approved sample details, and packing files, with any changes affecting later production clearly identified.
- The agreed checks and on-site test requirements, and access to the goods needed for random selection.
An approved sample is a comparison reference, not evidence that later production matches it. Our sample evaluation examines samples against drawings, specifications, and design documents; production goods still need their own inspection.Sample evaluation
Unfinished Packing
If production is complete and the lot meets the packing threshold, some packing may still be unfinished. The report must distinguish the product checks performed from the packaging, assortment, labeling, or carton checks that were unavailable. Unpacked units are not automatically excluded from every product check, but their unfinished packaging cannot be treated as inspected.
Where barcode or QR-code scanning is agreed, our requirement is 100% scan success for the inspected codes. Agree the scanning device and conditions, and compare the decoded information with the approved code data. Record unsuccessful scans as findings. This requirement does not mean the entire lot was scanned or guarantee readability on every other device.
Later container loading supervision can check carton counts, packing condition, loading, and the seal number. Those loading-stage checks do not turn unfinished production into inspected goods.Www.utsinspection.com
What Our Report States
Our reports present actual findings only. They describe the inspected lot, sampled SKUs and quantities, measurements, test results, defects, packing observations, and unavailable checks. Our published report scope includes identifying documents, tests, or areas that were unavailable.Www.utsinspection.com
For a partial order, distinguish quantities observed during the visit from completion figures supplied by the factory. Identify the unproduced balance and any goods excluded from the lot. A production schedule is not verified finished quantity, and a report for one lot must not be presented as coverage of another.
UTS reports do not contain recommendations, corrective-action plans, or shipment-release advice. The preparation and scheduling guidance in this article is general information, separate from report findings. The buyer or its authorized decision-maker decides whether to ship, hold, rework, or arrange another check.
If you need a whole-order final result, wait until the whole inspection lot meets the readiness requirements. If you need evidence sooner, define the available lot and its limits first. The key is not what the visit is called, but which goods were included and which checks were actually completed.
Share your ordered, finished, and packed quantities by SKU with our team to discuss the inspection scope before the visit.
Discuss Your Inspection Scope