No, not automatically. First check whether 40 means individual defects or units with major defects. Compare the matching count with the limits in your agreed sampling plan. If the lot is not accepted, check what your agreement requires: rework may be required, but the count alone does not tell you that.
What the 40 findings cover
In an acceptance sampling inspection, we check a sample from a defined lot. The result helps determine whether that lot meets the sampling plan's acceptance criteria. It is not a count of all defects in the shipment. [1]
What to check before comparing 40 with the limit
- Defect definition. Find the agreed criterion for a major defect. For example, a scratch may be classified differently on a visible surface than on a concealed one, depending on the specification.
- Counting basis. One item with two major defects contributes two defects to a defect count, but only one unit to a count of units with major defects. If the plan counts units, do not use the defect total in its place.
- Lot scope. Match the order lines, SKUs and quantities inspected to the goods you are deciding about. Do not apply the result to stock outside that lot.
- Sample. Check how many units were examined for the issue and whether the required sample and checks were completed. An unperformed check is not a passing check.
- Acceptance plan. Confirm the applicable standard and edition, inspection level and acceptance quality limit (AQL), if used. Find the Ac and Re that apply to major defects for that lot and sampling stage. Do not borrow limits from another lot or defect class.
If all you have is a headline total: Ask our team to clarify the observed count and, if the records support it, how many distinct units had a major defect. Check your agreed plan for the matching thresholds. If you cannot confirm the count or the applicable limits, you cannot determine the sampling result from 40 alone.
How to read Ac and Re for major defects
Ac is the acceptance number; Re is the rejection number. In a single-sampling plan for defective units, compare the count from the one sample with its limits. In double sampling, a first count between Ac and Re calls for a second sample, not an early verdict. Combine both counts and use the plan's second-stage limits; do not compare the second count on its own with the first-stage limits. [2]
| Count for the defect class | Decision for that class |
|---|---|
| At or below Ac | Meets the acceptance criterion for major defects only. |
| At or above Re | The lot is not accepted under the plan on the basis of major defects. |
| Between Ac and Re at the first stage of double sampling | Take the second sample specified by the plan before deciding. |
Hypothetical example: Suppose a sample of 200 units has 40 major defects, but those defects are spread across only 30 units. If your plan counts units with major defects, compare 30 with Ac and Re, not 40. If the same 40 defects were on 40 different units, the count to compare would be 40. A count at or below Ac for major defects does not settle the other defect categories or any separate acceptance checks.
If 40 distinct units out of 200 had a major defect, that would be 20% of the sampled units. It would not establish that 20% of the lot is defective. If the agreement specifies AQL 2.5, do not decide acceptance by comparing 20% with 2.5%. In a table-based plan, AQL helps select the plan; it is not a permitted defect percentage for each shipment. [3]
How we check production goods against a reference
In our pre-production sample evaluation, we compare a sample with drawings, specifications and design documents before full-scale manufacturing. An approved sample can then serve as a reference for production. Our final random inspection is a separate check: when production is 100% complete and at least 80% of the goods are packed, we draw samples at random and check them against the agreed specifications.
Our sample evaluation includes dimensional checks against engineering drawings. If a part is listed as out of tolerance, match the reported measurement to the specified dimension and tolerance on the agreed drawing revision. For a surface mark, check the finish requirement for that particular surface and use the approved sample if it forms part of the agreed reference. If two drawing revisions give different limits, confirm which one applies before challenging the classification or planning a correction.
What our report covers
UTS is a third-party inspection team. Our reports document what we checked, the requirements used, the observed defects, measurements and test results, and any checks we could not complete.
Our reports contain findings only. They do not give rework instructions, corrective-action plans, improvement recommendations or shipment-release advice, and they do not authorize shipment. Acceptance under a sampling plan is not shipment authorization.
What to agree with your supplier if the lot is not accepted
The steps below are general guidance for buyers and suppliers, not recommendations from a UTS inspection report.
Identify the goods covered by the findings
Use the defect descriptions and any available photos, measurements or carton references to trace the findings to the products inspected. Suppose all observed scratches were on the black version of a product. That gives you a starting point for tracing the stock; it does not prove the other colors are unaffected or mean you can remove the black units and treat the rest of the original lot as accepted. Use the lot identifiers and the agreed plan to decide whether any group can be evaluated separately.
Check the agreement before choosing a correction
Check what the agreement requires after a lot is not accepted and who can approve a different disposition. If it leaves the choice open, agree in writing which goods will be sorted, reworked or replaced. In the scratch example, sorting can separate visibly scratched units from units without that mark; it does not repair a finish. If the supplier proposes refinishing, agree how the repaired surface will be judged and what happens to units that cannot meet the requirement.
Define what the next inspection will check
For a re-inspection, record the goods to be presented, the checks and acceptance criteria, and how corrected and untouched stock will be identified. If the black units were refinished, for example, specify the visible surfaces and finish criterion, and whether adjacent surfaces also need checking for damage from the repair.
If your question is whether a defined lot meets a sampling plan after rework, agree on the lot and the plan for a new sample. If the question is whether every unit in that scope was checked for the specified finish issue, agree on a full inspection against your specifications. Checking every unit for one issue is not the same as checking every characteristic. Keep the original findings and follow-up results as separate records.
Planning a follow-up inspection? Share the affected SKUs, lot scope and checks you want us to perform.